PRODUCT SOLUTION A configurable payment-and-timer controller for converting selected AC-powered equipment into self-service, time-based operation. Convert a completed payment event into a configured period of AC power, followed by automatic cutoff when the time expires. Choose supported coin, bill or QR-code payment modules around the target market and service workflow. Use the integrated 4G module for remote status monitoring and parameter or timer management where the selected configuration and service support it. Add payment timing and controlled power operation to selected traditional equipment without rebuilding the complete machine system. Turn a completed payment into a configured period of AC power, followed by automatic cutoff. Select the switching arrangement and electrical protection for the host equipment. Discuss coin, bill and QR-code payment options for the installation market. Match the selected payment modules, currency and service integration to the operating plan. Set the purchased operating time around the equipment and service offered. Define the payment-to-time conversion and automatic cutoff sequence for a repeatable customer workflow. Discuss supported equipment-status and timer settings over the selected 4G service. Match the network bands, SIM package and platform access to the target region. Add pay-to-use timing to suitable existing equipment without replacing the complete machine. Review load characteristics, wiring and switching requirements for each retrofit. Share the host equipment, payment methods and operating market with KingNeed. Define the controller, installation interfaces and connected-management scope for a quotation. PROJECT SUPPORT Talk with a KingNeed specialist about the right configuration, integration and delivery requirements for your project.4G Pay-to-Use Power Controller

Key Features
Time-Based Power Control
Multiple Payment Options
Built-In 4G Connectivity
Retrofit-Oriented Deployment
Payment-Triggered AC Power Control

Choose the Payment Inputs

Time-Based Billing for Self-Service Use

4G Monitoring and Settings Options

Retrofit Compatible AC-Powered Equipment

Configure the Self-Service Deployment

Get pricing and technical details
Pay-to-Use Power Controller with 4G: Project Guide
Pay-to-use power controller for selected AC equipment, combining payment-triggered service time, automatic cutoff and configured 4G management.
Choose the configuration for your site
- Host-equipment load, AC supply and switching interface.
- Payment event, purchased operating time and cutoff workflow.
- Selected payment modules and supported 4G management service.
For a project quotation, provide the installation market, planned quantity, site layout and the equipment or utilities already available. Agree the supplied configuration, installation interfaces, maintenance access and service scope.
Product and purchasing questions
How does a pay-to-use power controller operate?
A completed payment event starts a configured period of AC power. The published controller automatically cuts off power when the service time expires; confirm the intended host-equipment workflow.
Can it convert any machine into self-service equipment?
It is presented for selected AC-powered equipment. Review the load characteristics, electrical interface, operating sequence and installation requirements before confirming a compatible retrofit.
Which payments and remote functions are described?
The page describes coin, bill and QR-code options plus integrated 4G connectivity for supported status, parameter and timer management. Confirm regional payment integration and the selected service.
